Location: Belgrade, Serbia Surface: Plexipave Date Completed: April 2023 Area: 500 m² Installer: 

Location: Belgrade, Serbia

Surface: Plexipave

Date Completed: April 2023

Area: 500 m²

Installer: 

PROJECT OVERVIEW

This private sport court in Belgrade presented a unique challenge: extensive surface cracking and heavy deviations in the asphalt, with no clearly identified cause. Potential contributing factors include underground water movement, invasive tree roots, or a combination of both.

To manage this unpredictable substrate without full reconstruction, Group Konzept Serbia implemented a flexible repair strategy to isolate the cracks and preserve surface integrity.

Repair Approach

  1. Crack Isolation with Tape:
    Thin rubber-reinforced tape was applied directly over cracks to bridge movement-prone areas. This technique allows the tape to absorb stress and reduce the risk of crack telegraphing into the acrylic top layers.

  2. Leveling with AR Mix:
    Two coats of AR (Acrylic Resurfacer) were applied over the taped sections, using a mix of AR, silica sand, and water to provide a uniform texture and embed the tape beneath the surface.

  3. Full Resurfacing:
    The court was completed with two coats of Plexipave Ultra Performance color, mixed with sand-filled Color Base, CSS’s standard water-based surface system, offering long-term durability and performance for recreational use.

RESULTS

As of the latest update, the repaired areas remain intact, with no return of visible cracking or deformation. The rubber-reinforced tape approach provided an effective buffer against substrate movement, making it a promising method for situations where underlying instability cannot be fully mitigated.

Installed by Group Konzept Serbia, April 2023